How to use the automatic machine?

Easy operation.

EI-35 Lamination Stacking Machine

Only 6 seconds

EI-66.7 Lamination Stacking Machine

Only 10 seconds

EI-85.8 Lamination Stacking Machine

Only 23 seconds.

How to operate the automatic machine?

How to operate the manual machine?

Manual instruction :

Machine operation procedure - Only 3 steps. Exp.: EI-57 Machine

-1. Put the E lamination 1 pce each on the bobbin before place in the machine.

-2. Start to use the machine.

-3. The transformer is complete in a short time.

-4. The EI Lamination core Qty on the Feeding EI slip Tower?

If your EI Lamination is big size, We suggest always remaining an extra 1/3 - 1/2 Qty of E & I Lamination core material on the E & I storage Feeding slip tower. These Lamination's weight will be helpful for pressing and fixing the bottom single Lamination position to stack into the Bobbin smoothly, without the E or I Lamination shaking while stacking into the Bobbin.

For example, 1 unit completed transformer is required 30 pcs EI Lamination core qty.
Please put the min. 60 pcs EI Lamination core qty on the EI storage feeding slip towers before stacking. 1 UNIT TRANSFORMER STACKING is required for the min. 2 UNITS transformer EI Lamination Core material on the feeding slip towers.

EI Q'TY

Share this page

HT5C machine with new designs : (Japanese-made steel with Parts.)

-1. Track Design
-2. Slide Plate Design
-3. Stopper Design
-4. Transmission Device

-6. Special coating, with the 3 times

     of Special hardness treatment.

-7. Durable / Easy Maintenace

-8. High performance after years.


* Less cost transformer production.
* Less loss of EI lamination material.
* Less labor cost.
* Less lead time of transformer order.

Operation Skills : 'Automatic Model'